HWY RAMP 1A-D over HWY ARRIVAL ROADWAY

1.20 KM SE OF CALLAHAN T · County 025, Massachusetts · Built 2001 · 3 Lanes · 10,600 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
B16561A99MPANBI
Year Built
2001
Length
150.9 m (495.1 ft)
Max Span
41.3 m
Width
14.2 m (46.6 ft)
Lanes
3
Daily Traffic
10,600
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
Other State Agencies
Last Inspected
N/A
Est. Improvement
$13,921,000
Total Project Cost
$20,882,000