HWY RAMP 1A-D over HWY ARRIVAL ROADWAY

1.2 K SE OF CALLAHAN TU · County 025, Massachusetts · Built 2001 · 3 Lanes · 10,600 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B165618F9MPANBI
Year Built
2001
Length
103 m (337.9 ft)
Max Span
51.8 m
Width
13.4 m (44 ft)
Lanes
3
Daily Traffic
10,600
Material
Concrete Continuous
Design
Segmental Box Girder
Owner
Other State Agencies
Last Inspected
N/A
Est. Improvement
$4,214,000
Total Project Cost
$6,322,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.