OTHER REMOVED over HWY LOGAN TRM B ARIV E

TERM B DEP ENT/ARIV ENT · County 025, Massachusetts · Built 1979 · 3 Lanes · 1,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
B16291B28MPANBI
Year Built
1979
Length
173.8 m (570.2 ft)
Max Span
24.4 m
Width
19.9 m (65.3 ft)
Lanes
3
Daily Traffic
1,000
Material
Prestressed Concrete
Design
Girder and Floorbeam System
Owner
Other State Agencies
Last Inspected
N/A
Est. Improvement
$22,480,000
Total Project Cost
$33,721,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.