HWY RAMP T-A/D over HWY RELIEF
1.20 KM SE OF CALLAHAN TU · County 025, Massachusetts · Built 2001 · 2 Lanes · 14,400 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.369444, -71.027778
This bridge is in worse condition than 24.1% of bridges in County 025. The average bridge in Massachusetts is 0 years old; this one is 25 years old.
Nearby Bridges
HWY RAMP U-A over HWY RAMP S-A
Built 2001
HWY RAMP T-D over HWY RAMP S-A
Built 2001
HWY RAMP E-T over HWY ACCESS ROAD
Built 1996
HWY RAMP U-A/D over HWY RAMP 1A-A/D
Built 2001
HWY RAMP T-A/D over I 90 & RAMP 1A-A/D
Built 2001
HWY RAMP T-A over HWY RAMP S-A
Built 2001
HWY RAMP T-D over HWY RELIEF
Built 2001
HWY RAMP E-T over HWY RAMP 1A A/D
Built 1996
HWY RAMP 1A/D over HWY RAMP 1A-A
Built 2001
HWY RAMP 1A/D over I 90 RAMP T-A/D HOTEL D
Built 2001
Bridge Details
- Structure #
- B16558A8UMPANBI
- Year Built
- 2001
- Length
- 108.6 m (356.3 ft)
- Max Span
- 49.1 m
- Width
- 14.6 m (47.9 ft)
- Lanes
- 2
- Daily Traffic
- 14,400
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Single or Spread
- Owner
- Other State Agencies
- Last Inspected
- N/A
- Est. Improvement
- $2,067,000
- Total Project Cost
- $3,101,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.