HWY RAMP T-A/D over HWY RELIEF

1.20 KM SE OF CALLAHAN TU · County 025, Massachusetts · Built 2001 · 2 Lanes · 14,400 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B16558A8UMPANBI
Year Built
2001
Length
108.6 m (356.3 ft)
Max Span
49.1 m
Width
14.6 m (47.9 ft)
Lanes
2
Daily Traffic
14,400
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
Other State Agencies
Last Inspected
N/A
Est. Improvement
$2,067,000
Total Project Cost
$3,101,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.