HWY RAMP T-A/D over I 90 & RAMP 1A-A/D

1.20 KM SE OF CALLAHAN TU · County 025, Massachusetts · Built 2001 · 2 Lanes · 14,400 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
B165589GLMPANBI
Year Built
2001
Length
143.2 m (469.8 ft)
Max Span
57.8 m
Width
16.4 m (53.8 ft)
Lanes
2
Daily Traffic
14,400
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
Other State Agencies
Last Inspected
N/A
Est. Improvement
$15,332,000
Total Project Cost
$22,999,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.