HWY W NEWTON ST over TR ORANGE LINE

BOSTON · County 025, Massachusetts · Built 1932 · 2 Lanes · 24,209 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B16496AAJMBTNBI
Year Built
1932
Reconstructed
1983
Length
112.5 m (369.1 ft)
Max Span
21.9 m
Width
24.4 m (80.1 ft)
Lanes
2
Daily Traffic
24,209
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Other State Agencies
Last Inspected
N/A
Est. Improvement
$1,790,000
Total Project Cost
$2,686,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.