HWY ELIOT BRIDGE over WATER CHARLES RIVER

.4 MI NW OF HARVARD ST · County 025, Massachusetts · Built 1950 · 4 Lanes · 46,415 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
B162464EVDOTNBI
Year Built
1950
Length
112.2 m (368.1 ft)
Max Span
33.5 m
Width
26.2 m (86 ft)
Lanes
4
Daily Traffic
46,415
Material
Steel Continuous
Design
Truss - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$19,221,000
Total Project Cost
$28,832,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.