HWY CAMBRIDGE ST over COMB I90 E RPS BDL & CS

.16 KM S CHARLES RV S105 · County 025, Massachusetts · Built 1965 · 4 Lanes · 27,500 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
B163664RUDOTNBI
Year Built
1965
Length
103.5 m (339.6 ft)
Max Span
26.2 m
Width
26.9 m (88.3 ft)
Lanes
4
Daily Traffic
27,500
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$18,163,000
Total Project Cost
$27,245,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.