I 90 EB RAMP ON D over I 90

.1 MI S. CHARLES RV S111 · County 025, Massachusetts · Built 1964 · 2 Lanes · 19,236 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
B163574RVDOTNBI
Year Built
1964
Length
365.5 m (1199.1 ft)
Max Span
40.2 m
Width
14.6 m (47.9 ft)
Lanes
2
Daily Traffic
19,236
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$34,691,000
Total Project Cost
$52,037,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.