HWY ARSENAL ST over WATER CHARLES RIVER

CITY LINE WAT BOS · County 025, Massachusetts · Built 1925 · 4 Lanes · 34,009 vehicles/day

Overall
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
B160154EFDOTNBI
Year Built
1925
Reconstructed
1968
Length
61.9 m (203.1 ft)
Max Span
21.3 m
Width
19.5 m (64 ft)
Lanes
4
Daily Traffic
34,009
Material
Concrete
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,849,000
Total Project Cost
$11,774,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.