HWY MT AUBURN ST over OTHER GREENWAY M/U PATH

2 MI S OF JCT SR2 · County 017, Massachusetts · Built 1955 · 5 Lanes · 36,600 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
C010143FVDOT634
Year Built
1955
Length
13.1 m (43 ft)
Max Span
10.4 m
Width
48.5 m (159.1 ft)
Lanes
5
Daily Traffic
36,600
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,409,000
Total Project Cost
$6,614,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.