HWY ADAMS ST over WATER NEPONSET RIVER

OVER NEPONSET RIV AT MILT · County 025, Massachusetts · Built 1765 · 2 Lanes · 32,845 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
B16003381MUNNBI
Year Built
1765
Reconstructed
2006
Length
36.3 m (119.1 ft)
Max Span
9.8 m
Width
18.2 m (59.7 ft)
Lanes
2
Daily Traffic
32,845
Material
Masonry
Design
Arch - Deck
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$4,372,000
Total Project Cost
$6,559,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.