I 90 WB over ST 12 SOUTHBRIDGE ST

AT I-90 MM 90.6 · County 027, Massachusetts · Built 1957 · 3 Lanes · 41,794 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
A170484KKDOTNBI
Year Built
1957
Reconstructed
1980
Length
95.4 m (313 ft)
Max Span
39.3 m
Width
17.7 m (58.1 ft)
Lanes
3
Daily Traffic
41,794
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$11,032,000
Total Project Cost
$16,549,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.