I 290 WB over ST 12 SOUTHBRIDGE ST

.2 MI N OF US-20 · County 027, Massachusetts · Built 1965 · 3 Lanes · 41,165 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
A170361QNDOTNBI
Year Built
1965
Length
58.1 m (190.6 ft)
Max Span
28.7 m
Width
18.2 m (59.7 ft)
Lanes
3
Daily Traffic
41,165
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,048,000
Total Project Cost
$10,573,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.