US 20 WB/WSHNGTN over I 395

EXIT 11A/B .3 MI S OF 90 · County 027, Massachusetts · Built 1965 · 3 Lanes · 10,027 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
A170381M9DOTNBI
Year Built
1965
Length
66.4 m (217.8 ft)
Max Span
22.9 m
Width
13.3 m (43.6 ft)
Lanes
3
Daily Traffic
10,027
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,786,000
Total Project Cost
$8,680,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.