US 20 EB/WSHNGTN over I 395

.3 MI S OF I-90 · County 027, Massachusetts · Built 1965 · 3 Lanes · 10,144 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
A170381M8DOTNBI
Year Built
1965
Length
64.6 m (211.9 ft)
Max Span
22.9 m
Width
13.3 m (43.6 ft)
Lanes
3
Daily Traffic
10,144
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$13,634,000
Total Project Cost
$20,452,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.