I 290 EB ON RAMP over I 395 SB

JUST NORTH OF U.S. 20 · County 027, Massachusetts · Built 1965 · 1 Lanes · 15,239 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
A170371KCDOTNBI
Year Built
1965
Reconstructed
1993
Length
71.6 m (234.9 ft)
Max Span
33.8 m
Width
8.4 m (27.6 ft)
Lanes
1
Daily Traffic
15,239
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,347,000
Total Project Cost
$2,021,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.