I 90 EB over ST 12 SOUTHBRIDGE ST

MM90.6 0.1 M E OF 290 · County 027, Massachusetts · Built 1957 · 3 Lanes · 42,886 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
A170484KJDOTNBI
Year Built
1957
Reconstructed
1980
Length
96 m (315 ft)
Max Span
39.4 m
Width
17.7 m (58.1 ft)
Lanes
3
Daily Traffic
42,886
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$11,147,000
Total Project Cost
$16,721,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.