I 90 WB over I 290

STA. 230 + 00 · County 027, Massachusetts · Built 1965 · 3 Lanes · 21,797 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
A170341QUDOTNBI
Year Built
1965
Length
111.6 m (366.1 ft)
Max Span
34.1 m
Width
17.2 m (56.4 ft)
Lanes
3
Daily Traffic
21,797
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$12,507,000
Total Project Cost
$18,761,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.