HWY THURBER AVE over RR AMTRAK/MBTA
AMTRAK RR MP 194/51 · County 005, Massachusetts · Built 1990 · 2 Lanes · 6,853 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
41.912069, -71.305264
This bridge is in worse condition than 14% of bridges in County 005. The average bridge in Massachusetts is 0 years old; this one is 36 years old.
Nearby Bridges
HWY TIFFANY ST over WATER TEN MILE RIVER
Built 2004
ST152 MAIN ST over RR AMTRAK/MBTA
Built 1949
ST152 MAIN ST over RR AMTRAK/MBTA
Built 1966
HWY BRIDGE ST over WATER TEN MILE RIVER
Built 1850
HWY THACHER ST over WATER TEN MILE RIVER
Built 1994
HWY POND ST NRTH over RR AMTRAK/MBTA
Built 1991
I 95 NB over HWY TIFFANY ST
Built 1959
I 95 SB over HWY TIFFANY ST
Built 1959
HWY POND ST over WATER TEN MILE RIVER
Built 1850
HWY THACHER ST over RR AMTRAK/MBTA
Built 2006
Bridge Details
- Structure #
- A160283YTDOT634
- Year Built
- 1990
- Length
- 21 m (68.9 ft)
- Max Span
- 20.1 m
- Width
- 11.3 m (37.1 ft)
- Lanes
- 2
- Daily Traffic
- 6,853
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,680,000
- Total Project Cost
- $2,521,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.