I 95 NB over HWY TIFFANY ST

.5 MI SW OF 123 & 95 · County 005, Massachusetts · Built 1959 · 3 Lanes · 28,571 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
A160483QCDOTNBI
Year Built
1959
Length
18.3 m (60 ft)
Max Span
17.1 m
Width
17.4 m (57.1 ft)
Lanes
3
Daily Traffic
28,571
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,280,000
Total Project Cost
$3,421,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.