HWY POND ST NRTH over RR AMTRAK/MBTA
AMTRAK RR MM 193.4 · County 005, Massachusetts · Built 1991 · 2 Lanes · 8,100 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
41.902189, -71.330247
This bridge is in worse condition than 58.7% of bridges in County 005. The average bridge in Massachusetts is 0 years old; this one is 35 years old.
Nearby Bridges
HWY POND ST over WATER TEN MILE RIVER
Built 1850
HWY BRIDGE ST over WATER TEN MILE RIVER
Built 1850
ST152 MAIN ST over RR AMTRAK/MBTA
Built 1966
HWY COUNTY ST over WATER SEVEN MILE RIVER
Built 1950
I 95 NB over HWY READ ST
Built 1959
I 95 SB over HWY READ ST
Built 1959
HWY COUNTY ST over RR AMTRAK/MBTA
Built 2011
I 95 over WATER SEVEN MILE RIVER
Built 1959
CENTRAL AV over TEN MILE RIVER
Built 1947
ST 1 A/NEWPRT AV over COMB RR AMTRAK/MBTA RD
Built 2011
Bridge Details
- Structure #
- A16030403DOT634
- Year Built
- 1991
- Length
- 15.5 m (50.9 ft)
- Max Span
- 15.4 m
- Width
- 11.1 m (36.4 ft)
- Lanes
- 2
- Daily Traffic
- 8,100
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,153,000
- Total Project Cost
- $1,730,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.