ST 1 A/NEWPRT AV over COMB RR AMTRAK/MBTA RD

.2 MI SO I 95 INTERCHANGE · County 005, Massachusetts · Built 2011 · 5 Lanes · 34,933 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
A16032B59DOT634
Year Built
2011
Length
28.4 m (93.2 ft)
Max Span
27.4 m
Width
21.9 m (71.9 ft)
Lanes
5
Daily Traffic
34,933
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,763,000
Total Project Cost
$2,645,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.