HWY POND ST over WATER TEN MILE RIVER

JUST WEST OF ST152 · County 005, Massachusetts · Built 1850 · 2 Lanes · 6,853 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
S080023JYMUNNBI
Year Built
1850
Reconstructed
1926
Length
11 m (36.1 ft)
Max Span
9.8 m
Width
7.2 m (23.6 ft)
Lanes
2
Daily Traffic
6,853
Material
Concrete
Design
Tee Beam
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$561,000
Total Project Cost
$842,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.