I-74 EB (SB) over 12TH AVE-MOLINE

0.7 MI N OF 23RD AVE · County 161, Illinois · Built 2020 · 3 Lanes · 25,800 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
081018300000000
Year Built
2020
Length
25 m (82 ft)
Max Span
22.9 m
Width
23 m (75.5 ft)
Lanes
3
Daily Traffic
25,800
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.