RAMP 6TH D over BNSF RR & 4TH AVE

.75 mi S of Iowa Sta · County 161, Illinois · Built 2019 · 1 Lanes · 23,450 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
081018700000000
Year Built
2019
Length
153.9 m (504.9 ft)
Max Span
52.6 m
Width
10.1 m (33.1 ft)
Lanes
1
Daily Traffic
23,450
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.