I 74 NB over IL 92EB&WB(1-7TH AV)

APPROACH TO MISS RIV · County 161, Illinois · Built 2019 · 5 Lanes · 23,450 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
081017700000000
Year Built
2019
Length
590.2 m (1936.4 ft)
Max Span
70.1 m
Width
24.1 m (79.1 ft)
Lanes
5
Daily Traffic
23,450
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.