FAI 74 EB over 19TH ST S.B.-MOLINE

.2 MI S 23RD AVE · County 161, Illinois · Built 2019 · 2 Lanes · 25,800 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
081018500000000
Year Built
2019
Length
79.2 m (259.8 ft)
Max Span
29.2 m
Width
21.2 m (69.6 ft)
Lanes
2
Daily Traffic
25,800
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.