19TH ST NB-MOLINE over FAI 74
.6 MI S 23RD AVE · County 161, Illinois · Built 1971 · 2 Lanes · 4,600 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
41.484311, -90.498231
This bridge is in worse condition than 54% of bridges in County 161. The average bridge in Illinois is 0 years old; this one is 55 years old.
Nearby Bridges
27TH ST SB-MOLINE over FAI 74
Built 1971
23RD AVE-MOLINE over FAI 74
Built 1970
FAI 74 SB over 36TH AVE - MOLINE
Built 1973
FAI 74 NB over COALTOWN RD-MOLINE
Built 1973
27TH ST.-MOLINE over STREAM
Built 1937
39TH AVE over DRAINAGE DITCH
Built 1972
FAI 74 EB over 19TH ST S.B.-MOLINE
Built 2019
FAI 74 WB over 19TH ST S.B.-MOLINE
Built 2019
IL 5 EB (J DEERE R over FAI 74
Built 1970
IL 5 WB (J DEERE R over FAI 74
Built 1970
Bridge Details
- Structure #
- 081010800000000
- Year Built
- 1971
- Length
- 71.4 m (234.3 ft)
- Max Span
- 37.5 m
- Width
- 12.9 m (42.3 ft)
- Lanes
- 2
- Daily Traffic
- 4,600
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $811,000
- Total Project Cost
- $1,217,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.