OAK RUN ROAD over TRIB TO SPOON LAKE
SE-34-T12NR3E · County 095, Illinois · Built 1970 · 2 Lanes · 500 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
40.9791, -90.138239
This bridge is in worse condition than 55.3% of bridges in County 095. The average bridge in Illinois is 0 years old; this one is 56 years old.
Nearby Bridges
CH 7 over SUGAR CREEK
Built 2016
OAK RUN ROAD over TRIB TO SPOON LAKE
Built 1998
OAK RUN ROAD-TR 50 over SPOON LAKE OVERFLOW
Built 1970
TR 171 over TRIB TO SPOON RIVER
Built 1996
COUNTY HIGHWAY 12 over TRIB TO SUGAR CREEK
Built 1998
TR 187 over SUGAR CR
Built 1983
FAS 394 - CH 12 over TRIB. COURT CREEK
Built 1993
TR 240 over COURT CREEK
Built 1989
FAS 394-CH 12 over COURT CREEK
Built 1982
TR 171 over SNAKEDEN HOLLOWCREEK
Built 2008
Bridge Details
- Structure #
- 048328000000000
- Year Built
- 1970
- Length
- 14.9 m (48.9 ft)
- Max Span
- 14.6 m
- Width
- 8.6 m (28.2 ft)
- Lanes
- 2
- Daily Traffic
- 500
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.