FAS 394-CH 12 over COURT CREEK
NE 21 - T11N R3E · County 095, Illinois · Built 1982 · 2 Lanes · 900 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
40.930453, -90.161494
This bridge is in worse condition than 72.4% of bridges in County 095. The average bridge in Illinois is 0 years old; this one is 44 years old.
Nearby Bridges
FAS 394 - CH 12 over TRIB. COURT CREEK
Built 1993
COUNTY HIGHWAY 12 over TRIB TO SUGAR CREEK
Built 1998
TR 240 over COURT CREEK
Built 1989
TR 206 over NORTH CREEK
Built 1999
TR 187 over SUGAR CR
Built 1983
APPLETON ROAD over I-74
Built 1967
OAK RUN ROAD-TR 50 over SPOON LAKE OVERFLOW
Built 1970
TR 176/Barefoot Rd over COURT CREEK
Built 2013
TR 619A over COURT CREEK
Built 1992
TR 176/Barefoot Rd over BNSF RR
Built 2013
Bridge Details
- Structure #
- 048327800000000
- Year Built
- 1982
- Length
- 61.3 m (201.1 ft)
- Max Span
- 24.4 m
- Width
- 9.3 m (30.5 ft)
- Lanes
- 2
- Daily Traffic
- 900
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.