TR 187 over SUGAR CR
NE-14-T11N R3E · County 095, Illinois · Built 1983 · 2 Lanes · 25 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
40.938881, -90.126308
This bridge is in worse condition than 36.2% of bridges in County 095. The average bridge in Illinois is 0 years old; this one is 43 years old.
Nearby Bridges
OAK RUN ROAD-TR 50 over SPOON LAKE OVERFLOW
Built 1970
TR 240 over COURT CREEK
Built 1989
TR 619A over COURT CREEK
Built 1992
TR 215 over SPOON RIVER
Built 1986
CH 15 over COURT CREEK
Built 1992
TR 171 over TRIB TO SPOON RIVER
Built 1996
FAS 394 - CH 12 over TRIB. COURT CREEK
Built 1993
FAS 394-CH 12 over COURT CREEK
Built 1982
COUNTY HIGHWAY 12 over TRIB TO SUGAR CREEK
Built 1998
OAK RUN ROAD over TRIB TO SPOON LAKE
Built 1998
Bridge Details
- Structure #
- 048328400000000
- Year Built
- 1983
- Length
- 18.6 m (61 ft)
- Max Span
- 18.3 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 25
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.