COUNTY HIGHWAY 12 over TRIB TO SUGAR CREEK
S.CTR-9-T11NR3E · County 095, Illinois · Built 1998 · 2 Lanes · 850 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
40.945772, -90.16605
This bridge is in worse condition than 14.1% of bridges in County 095. The average bridge in Illinois is 0 years old; this one is 28 years old.
Nearby Bridges
FAS 394 - CH 12 over TRIB. COURT CREEK
Built 1993
FAS 394-CH 12 over COURT CREEK
Built 1982
TR 206 over NORTH CREEK
Built 1999
TR 240 over COURT CREEK
Built 1989
OAK RUN ROAD over TRIB TO SPOON LAKE
Built 1998
TR 183 over NORTH CREEK
Built 2011
OAK RUN ROAD-TR 50 over SPOON LAKE OVERFLOW
Built 1970
TR 187 over SUGAR CR
Built 1983
TR 176/Barefoot Rd over COURT CREEK
Built 2013
TR 161 over NORTH CREEK
Built 1991
Bridge Details
- Structure #
- 048335100000000
- Year Built
- 1998
- Length
- 18.8 m (61.7 ft)
- Max Span
- 17.9 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 850
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.