CH 2 over TRIB YOUNG BRANCH
3.75 MI E BROUGHTON · County 065, Illinois · Built 1998 · 2 Lanes · 25 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
37.930544, -88.38725
This bridge is in worse condition than 11.8% of bridges in County 065. The average bridge in Illinois is 0 years old; this one is 28 years old.
Nearby Bridges
100E - TR 28A over BEAR CREEK
Built 2012
TR 13-GRUMLEY RD over TRIB N FORK SALINE R
Built 1997
FAS-881 (CH-11) over N FK SALINE RIVER
Built 1989
TR 3 over ABANDONED RR
Built 1900
US 45 over BEAR CREEK OVERFLOW
Built 2023
TR-401 over BEAR CREEK
Built 1991
US 45 over BEAR CREEK
Built 2023
FAS 881 over Bear Creek
Built 2012
FAP 331 (US 45) over North Fork Saline River
Built 2024
FAP-877 (ILL-141) over BEAR CREEK
Built 1957
Bridge Details
- Structure #
- 033326700000000
- Year Built
- 1998
- Length
- 16 m (52.5 ft)
- Max Span
- 15.2 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 25
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.