TR 13-GRUMLEY RD over TRIB N FORK SALINE R
1.5 MI N TEXAS CITY · County 165, Illinois · Built 1997 · 2 Lanes · 25 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
37.900353, -88.387608
This bridge is in worse condition than 30.3% of bridges in County 165. The average bridge in Illinois is 0 years old; this one is 29 years old.
Nearby Bridges
FAP 331 (US 45) over North Fork Saline River
Built 2024
FAP 332 (US 45) over N Fork Saline R Overflow
Built 2024
TR 33 over BRUSH CREEK
Built 1993
TR 3 over ABANDONED RR
Built 1900
TR 324 over RECTOR CR
Built 1987
CH 2 over TRIB YOUNG BRANCH
Built 1998
US 45 over BRUSH CREEK
Built 2016
FAP-877 (ILL-141) over BEAR CREEK
Built 1957
GARNER RD over BRUSH CREEK
Built 2018
CH 3 over RECTOR CREEK
Built 1977
Bridge Details
- Structure #
- 083321300000000
- Year Built
- 1997
- Length
- 12.6 m (41.3 ft)
- Max Span
- 11.9 m
- Width
- 7.4 m (24.3 ft)
- Lanes
- 2
- Daily Traffic
- 25
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.