FAP-877 (ILL-141) over BEAR CREEK

.9 MI E US-45 JCT · County 193, Illinois · Built 1957 · 2 Lanes · 3,250 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
097002700000000
Year Built
1957
Reconstructed
2015
Length
54.9 m (180.1 ft)
Max Span
19.9 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
3,250
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.