US 45 over BEAR CREEK OVERFLOW

2.5 MI S IL 1/US 45 · County 193, Illinois · Built 2023 · 2 Lanes · 2,500 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
097201900000000
Year Built
2023
Length
10.1 m (33.1 ft)
Max Span
3.3 m
Lanes
2
Daily Traffic
2,500
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.