ARCHER AVE over S FK S BR CHI RIVER
3100 S 1550 W P5C · County 031, Illinois · Built 1963 · 6 Lanes · 24,100 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 6 | Satisfactory |
Location
41.838356, -87.664539
This bridge is in worse condition than 35.3% of bridges in County 031. The average bridge in Illinois is 0 years old; this one is 63 years old.
Nearby Bridges
I- 55 EB ELEVATED over S BR CHICAGO RIVER
Built 1963
I- 55 WB ELEVATED over S BR CHICAGO RIVER
Built 1963
I- 55 WB STEVENSON over LOCK ST
Built 1963
I- 55 EB STEVENSON over LOCK ST
Built 1963
I- 55 EB STEVENSON over LOOMIS & FULLER STS
Built 1964
I- 55 WB STEVENSON over LOOMIS & FULLER STS
Built 1964
ASHLAND AVE over S BR CHICAGO RIVER
Built 1938
I- 55 WB ELEVATED over ASHLAND AVE VIADUCT
Built 1963
I- 55 EB ELEVATED over ASHLAND AVE VIADUCT
Built 1963
W. 29TH STREET over PRIVATE PROPERTY
Built 2002
Bridge Details
- Structure #
- 016607100000000
- Year Built
- 1963
- Reconstructed
- 2005
- Length
- 66.5 m (218.2 ft)
- Max Span
- 41.6 m
- Width
- 28.3 m (92.8 ft)
- Lanes
- 6
- Daily Traffic
- 24,100
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,271,000
- Total Project Cost
- $1,907,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.