I- 55 WB ELEVATED over S BR CHICAGO RIVER

1.1 M SW I-94 · County 031, Illinois · Built 1963 · 3 Lanes · 75,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
016108500000000
Year Built
1963
Reconstructed
2000
Length
118 m (387.1 ft)
Max Span
32.4 m
Width
23.2 m (76.1 ft)
Lanes
3
Daily Traffic
75,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,043,000
Total Project Cost
$3,065,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.