I- 55 WB ELEVATED over ASHLAND AVE VIADUCT
2.6 M SW I-90 94 · County 031, Illinois · Built 1963 · 3 Lanes · 64,100 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
41.837067, -87.674194
This bridge is in worse condition than 35.3% of bridges in County 031. The average bridge in Illinois is 0 years old; this one is 63 years old.
Nearby Bridges
I- 55 EB ELEVATED over ASHLAND AVE VIADUCT
Built 1963
DAMEN AVE over LAND-32ND TO I55 RPS
Built 1930
DAMEN AVE & 4 RAMP over I- 55 STEVENSON
Built 1963
DAMEN AVE. over PRIVATE PROPERTY
Built 2002
W. 29TH STREET over PRIVATE PROPERTY
Built 2002
DAMEN AVE over BNSF & CN RR & Land
Built 1930
DAMEN AVE over S BR CHICAGO RIVER
Built 1930
ARCHER AVE over S FK S BR CHI RIVER
Built 1963
I- 55 EB ELEVATED over S BR CHICAGO RIVER
Built 1963
WESTERN AV/31ST over SANITARY&SHIP CANAL
Built 1940
Bridge Details
- Structure #
- 016108300000000
- Year Built
- 1963
- Reconstructed
- 2000
- Length
- 748.8 m (2456.7 ft)
- Max Span
- 40.1 m
- Width
- 19 m (62.3 ft)
- Lanes
- 3
- Daily Traffic
- 64,100
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $6,904,000
- Total Project Cost
- $10,356,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.