I- 55 WB STEVENSON over LOOMIS & FULLER STS
0.9 M SW I-94 · County 031, Illinois · Built 1964 · 3 Lanes · 75,500 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
41.842217, -87.658281
This bridge is in worse condition than 17% of bridges in County 031. The average bridge in Illinois is 0 years old; this one is 62 years old.
Nearby Bridges
I- 55 EB STEVENSON over LOOMIS & FULLER STS
Built 1964
I- 55 EB STEVENSON over LOCK ST
Built 1963
I- 55 WB STEVENSON over LOCK ST
Built 1963
I- 55 EB TO I-94 N over THROOP ST
Built 1999
I- 55 EB STEVENSON over THROOP ST
Built 1963
I- 55 WB STEVENSON over THROOP ST
Built 1963
LOOMIS ST over S BR CHICAGO RIVER
Built 1904
I- 55 WB ELEVATED over S BR CHICAGO RIVER
Built 1963
I- 55 EB ELEVATED over S BR CHICAGO RIVER
Built 1963
ARCHER AVE over S FK S BR CHI RIVER
Built 1963
Bridge Details
- Structure #
- 016096800000000
- Year Built
- 1964
- Reconstructed
- 2000
- Length
- 165.2 m (542 ft)
- Max Span
- 30.7 m
- Width
- 22 m (72.2 ft)
- Lanes
- 3
- Daily Traffic
- 75,500
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,206,000
- Total Project Cost
- $1,809,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.