CENTRAL AVE. over ICG RR & GROUND

0.08M.S.OF I-55 · County 031, Illinois · Built 1964 · 6 Lanes · 34,100 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
016324100000000
Year Built
1964
Reconstructed
2014
Length
140.1 m (459.6 ft)
Max Span
26.9 m
Width
31 m (101.7 ft)
Lanes
6
Daily Traffic
34,100
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.