I- 55 WB STEVENSON over RR - BRC

0.25 M E ILL 50 · County 031, Illinois · Built 1963 · 4 Lanes · 68,750 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
016001900000000
Year Built
1963
Reconstructed
2000
Length
51.2 m (168 ft)
Max Span
27.7 m
Width
21.9 m (71.9 ft)
Lanes
4
Daily Traffic
68,750
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,063,000
Total Project Cost
$1,595,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.