I- 55 WB STEVENSON over IL 50 (CICERO AVE)

5.7 M SW I94 · County 031, Illinois · Built 1963 · 3 Lanes · 68,750 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
016001700000000
Year Built
1963
Reconstructed
2000
Length
61.8 m (202.8 ft)
Max Span
34.5 m
Width
18.1 m (59.4 ft)
Lanes
3
Daily Traffic
68,750
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$936,000
Total Project Cost
$1,404,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.