CENTRAL AVE & RAMP over I- 55 STEVENSON

1.1 M SW IL 50 · County 031, Illinois · Built 1964 · 6 Lanes · 9,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
016072400000000
Year Built
1964
Reconstructed
2012
Length
99.4 m (326.1 ft)
Max Span
27.2 m
Width
46.3 m (151.9 ft)
Lanes
6
Daily Traffic
9,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$13,413,000
Total Project Cost
$20,120,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.