CANAL ST over I- 55 STEVENSON

0.3 M E I-94 · County 031, Illinois · Built 1965 · 4 Lanes · 10,300 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
016113900000000
Year Built
1965
Reconstructed
2003
Length
56.3 m (184.7 ft)
Max Span
17.1 m
Width
19.8 m (65 ft)
Lanes
4
Daily Traffic
10,300
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$229,000
Total Project Cost
$275,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.