I- 55 EB TO NB FRK over I- 55 STEVENSON

0.6 M E I-94 · County 031, Illinois · Built 1964 · 1 Lanes · 6,600 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
016105600000000
Year Built
1964
Reconstructed
2002
Length
455.5 m (1494.4 ft)
Max Span
29.3 m
Width
8.9 m (29.2 ft)
Lanes
1
Daily Traffic
6,600
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,336,000
Total Project Cost
$5,004,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.