CHINATOWN RAMP NB over I- 55 STEVENSON
0.7 M E I-94 · County 031, Illinois · Built 1965 · 2 Lanes · 32,600 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
41.847086, -87.631314
This bridge is in worse condition than 62.9% of bridges in County 031. The average bridge in Illinois is 0 years old; this one is 61 years old.
Nearby Bridges
CHINATOWN RAMP SB over I- 55 STEVENSON
Built 1965
I- 55 S RMP I-90 9 over I- 55 STEVENSON
Built 1965
WENTWORTH AVE over I- 55 STEVENSON
Built 1964
FRANKLIN SB TO 55W over WENTWORTH AVE 2 RMPS
Built 1964
26TH ST over FRANKLIN ST EXTEND
Built 1964
I- 55 EB TO NB FRK over I- 55 STEVENSON
Built 1964
RYAN NB FRNT RD B over CHINATOWN FEEDER
Built 1964
STATE ST over I- 55 STEVENSON
Built 1965
I- 90 94 NB ELV LO over WELLS TO 29TH PL
Built 1962
STATE ST TURNAROUN over I- 55 STEVENSON
Built 1994
Bridge Details
- Structure #
- 016027100000000
- Year Built
- 1965
- Reconstructed
- 2002
- Length
- 153.3 m (503 ft)
- Max Span
- 27.4 m
- Width
- 14.2 m (46.6 ft)
- Lanes
- 2
- Daily Traffic
- 32,600
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $904,000
- Total Project Cost
- $1,356,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.