RYAN NB FRNT RD B over CHINATOWN FEEDER
0.2 M S I-55 · County 031, Illinois · Built 1964 · 2 Lanes · 4,100 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
41.844711, -87.6317
This bridge is in worse condition than 17% of bridges in County 031. The average bridge in Illinois is 0 years old; this one is 62 years old.
Nearby Bridges
26TH ST over FRANKLIN ST EXTEND
Built 1964
CHINATOWN RAMP NB over I- 55 STEVENSON
Built 1965
CHINATOWN RAMP SB over I- 55 STEVENSON
Built 1965
I- 55 S RMP I-90 9 over I- 55 STEVENSON
Built 1965
WENTWORTH AVE over I- 55 STEVENSON
Built 1964
I- 55 EB TO NB FRK over I- 55 STEVENSON
Built 1964
I- 90 94 NB ELV LO over WELLS TO 29TH PL
Built 1962
FRANKLIN SB TO 55W over WENTWORTH AVE 2 RMPS
Built 1964
I- 90 94 ELEV EXP over STEWART AVE TO 28 PL
Built 1962
I- 90 94 ELEV LOCA over STEWART ST TO 29 ST
Built 1962
Bridge Details
- Structure #
- 016109300000000
- Year Built
- 1964
- Reconstructed
- 2009
- Length
- 84.4 m (276.9 ft)
- Max Span
- 33.5 m
- Width
- 9.2 m (30.2 ft)
- Lanes
- 2
- Daily Traffic
- 4,100
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $987,000
- Total Project Cost
- $1,481,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.