I- 90 94 RYAN ELEV over CANAL TO STEWART STS
0.4 M S I-55 · County 031, Illinois · Built 1962 · 10 Lanes · 245,500 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
4
Poor
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 4 | Poor |
| Substructure | 4 | Poor |
Location
41.846167, -87.638292
This bridge is in worse condition than 86.6% of bridges in County 031. The average bridge in Illinois is 0 years old; this one is 64 years old.
Nearby Bridges
I- 94 NB TO I-55 W over I- 55 STEVENSON
Built 1964
CANAL ST over I- 55 STEVENSON
Built 1965
I- 90 94 ELEV LOCA over STEWART ST TO 29 ST
Built 1962
I- 90 94 ELEV EXP over STEWART AVE TO 28 PL
Built 1962
STEWART AVE over I- 55 STEVENSON
Built 1966
I- 55 WB RMP RYAN over ARCHER; BNSF & IC RR
Built 1964
I- 90 94 NB ELV LO over WELLS TO 29TH PL
Built 1962
I- 55 EB TO NB FRK over I- 55 STEVENSON
Built 1964
I- 55 EB TO RYAN N over I- 55 STEVENSON
Built 1964
I- 55 EB RMP RYAN over DRY LAND
Built 1964
Bridge Details
- Structure #
- 016111600000000
- Year Built
- 1962
- Reconstructed
- 1989
- Length
- 175.2 m (574.8 ft)
- Max Span
- 68 m
- Width
- 40.2 m (131.9 ft)
- Lanes
- 10
- Daily Traffic
- 245,500
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,804,000
- Total Project Cost
- $2,165,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.